The ISF Construction in Doha the capital city of
Our team was involved in cost control procedures of the project upon request from the joint venture.
With the local Cost Control department’s guidance and supervision, CostTools was installed. Based on flexibility the system developed and extended to integrate with various local cost control data sources.
The result was a series of specialized cost control reports that were produced using the extended reporting